Where I am at these days.

It’s been a while between here and when I last updated my blog.
After Caval Ridge, I had a couple of months off over the Christmas/New Year’s break.
I’m currently sitting in a crib room at a field compressor station called Matilda John (on the QCLNG project)filling out inspection and test check sheets for installed equipment here. Something that should’ve been done after the devices and cables were installed.
Ho-hum, it’s another construction gig that’s arse about face again.